Almaria logo
The Third Hangar
Back to News
InfrastructureExpansionCapacity

The Third Hangar

July 12, 2022


The construction of the third hangar has been completed, bringing the number of cows that the farm can accommodate to 504 cows.\n\nThis major infrastructure project represents a significant milestone in our farm's expansion strategy. The new hangar has been designed and built to the highest standards, incorporating modern farming technologies and animal welfare best practices.\n\nKey features of the new hangar include:\n\n• Climate-controlled environment for optimal cow comfort\n• Advanced ventilation systems ensuring fresh air circulation\n• Automated feeding systems for efficient nutrition delivery\n• Comfortable bedding areas designed for cow rest and well-being\n• Integrated waste management systems for environmental sustainability\n\nThe completion of this hangar increases our total capacity by 50%, allowing us to accommodate our growing herd while maintaining the high standards of care and comfort that our animals deserve. Each cow has ample space, ensuring reduced stress and optimal milk production.\n\nThis expansion is part of our long-term vision to become one of the region's premier dairy operations. The investment demonstrates our confidence in the dairy sector and our commitment to sustainable, ethical farming practices.\n\nConstruction was completed on schedule and within budget, thanks to the expertise of our engineering team and construction partners. The facility is now fully operational and already housing our expanded herd.

Back to News
Almaria logo
HomeOur FarmContact UsGallery

© 2026 Almaria farm. All rights reserved